Peer Ki Gali (Mughal Road) (11,450 FT)
Clearance Agency: BRO 144 TF • Stood Down

KJCPL Journal of Record
Real-time multi-spectral pass diagnostics, convoy clearance vectors, snow cutter fleet telemetry, and avalanche hazard contours across 7 vital territorial lifelines connecting the Kashmir Valley, Chenab Basin, Pir Panjal, Jammu, and the Trans-Himalayan plateau of Ladakh.
Cross-sectional terrain relief gradient illustrating vertical ascent hurdles and thermal inversion boundaries.
| Pass & Highway Corridor | Directional Flow | Entry Gate Open | Rigid Cutoff IST | Vehicle Eligibility Tier | Clearance Verification |
|---|---|---|---|---|---|
| NH-1DZoji La (Minamarg Gate) | Ladakh towards Kashmir (Downhill) | 06:00 IST | 11:30 IST | LMVs & 4x4 Chains Mandated | VERIFIED PASS |
| NH-1DZoji La (Sonamarg/Baltal) | Kashmir towards Ladakh (Uphill) | 12:30 IST | 16:00 IST | Petroleum Tankers & Military Essential | REGULATED CONVOY |
| NH-44Jammu - Srinagar Tunnel | Bi-Directional Continuous | 00:00 IST | 24-HR UNBLOCKED | All Passenger & Commercial Cargo | CLEAR GREEN |
| NH-244Sinthan Top (Chingam) | Kishtwar to Anantnag | 09:00 IST | 14:00 IST | Light Motor Vehicles (4x4 ONLY) | CHAINS REQUIRED |
| MUGHALPeer Ki Gali (Bafliaz) | Shopian <--> Poonch / Rajouri | SUSPENDED | SUSPENDED | Strictly No Civilian Vehicles Permitted | RED BLOCKED |
Immediate satellite tele-links and dedicated traffic PCR wire desks for emergency vehicle distress or pass blockades.
In deep gorges or zero-data high passes (Zojila, Sinthan, Peer Ki Gali), transmit low-frequency geo-coded SMS beacons to our central autonomous relay node.